ERA BOARD DECISION IN PUBLIC
in relation to the Integrated Pollution Prevention and Control (IPPC) on:
IP 0002/21 – Application for the Renewal and variation of IPPC permit (IP 0002/07/G) of the Delimara Power Station in relation to the operation of a power station carrying out activity 1.1 (combustion of fuels in installations with a total rated thermal input of 50 MW or more) as per Schedule 1 of S.L. 549.77, submitted by Enemalta plc., Electrogas Malta Ltd. and D3 Power Generation Ltd.
Date
Time
Friday, 18 February 2022
10:00 am
The public is invited to follow this meeting online during which the decision will be taken in public by the ERA Board in connection with the above proposal.
A link to the meeting will be communicated to all registered interested parties.
The public is invited to register their interest to follow the ERA Board decision by not later than the 16 February 2022 by filling in the form below.
Documentation in relation to the ERA Board decision can be accessed from the links below.
ERA Case Officer Report
Operator Presentations
ERA Presentation
Public Consultation Feedback
Link to Application