PUBLIC CONSULTATION BY THE ENVIRONMENT AND RESOURCES AUTHORITY
in relation to the Integrated Pollution Prevention and Control (IPPC)
Name of Facility
Application Number
Location
Proposal
Delimara Power Station
IP 0002/2021
Delimara Power Station, Triq il-Power Station, Delimara
Renewal and variation of IPPC permit (IP 0002/07/G) of the Delimara Power Station in relation to the operation of a power station carrying out activity 1.1 (combustion of fuels in installations with a total rated thermal input of 50 MW or more) as per Schedule 1 of S.L. 549.77, submitted by Enemalta plc., Electrogas Malta Ltd. and D3 Power Generation Ltd.
The documentation related to this public consultation may be viewed below:
Any representations may be made in writing by not later than 2 January 2022 by filling in the form below.
Alternatively, representations may be sent to the postal address listed below.
Any representations shall be registered and made public on ERA’s website, together with the details of the person making the submission unless otherwise requested in writing, in which case only the content of the representation shall be made publicly available.
Public consultation on this application is now closed.
Postal Address
Director Environment & Resources
(ref: IPPC IP0002/2021)
Environment & Resources Authority
Hexagon House,
Spencer Hill,
Marsa, MRS 1441
For further assistance, you are kindly requested to send an email to [email protected].