PA 02906/16 (EA 00030/15) - Fort Cambridge new high rise hotel at, Triq Tigne c/w, Triq Il- Ponta Ta' Dragut, Sliema, Malta.

​​PA File No.:  PA 02906/16

Other Reference: EA 00030/15

Project Title: Retention of the historic existing facades of the Fort Cambridge barracks building and demolition of the existing southwest facade and internal structure . proposed excavation and construction of a new high-rise hotel Class 3B including all ancillary facilities and amenities.

LocationSite at, Triq Tigne c/w, Triq Il- Ponta Ta' Dragut, Sliema, Malta.

 
 
​​Pre-Screening DecisionReference is made to Minute 1 in relation with the retention of the historic existing facades of the Fort Cambridge barracks building and demolition of the existing southwest facade and internal structure; the proposed excavation and construction of a new high-rise hotel Class 3B including all ancillary facilities and amenities, at Triq Tigne c/w, Triq Il- Ponta Ta' Dragut, Sliema.  In view of the fact that the proposed development has a site area of 2498 sqm, a gross floor area of approximately 39,000 sqm, shall have a height of approximately 40 storeys and will include approximately 678 beds; the proposal qualifies for further assessment in
terms of Schedule IA, Category 3.3.2.1 of the EIA Regulations, 2007 (Legal Notice 114 of 2007, as amended) and thus the submission of a Project Description Statement (PDS) is required.  Guidelines for the submission of the PDS can be found through the following link: http://era.org.mt/en/Pages/EIAscreening.aspx.
 
 
Status: Concluded
 
EIA Terms of Reference Consultation Period: 4 December 2015 - 4 January 2015
 
EIA Terms of ReferencePA 02906/16 - EIA_TORs


Consultation Dates of EIA Report: 23 January 2018 - 23 February 2018
 
Public Hearing Date and Location: N/A

Deadline for Comments: N/A
 
Minutes of Public Hearing: N/A
 
ERA Report: ​