PA File No.: PA/01821/19 & PA/00879/23
ERA Reference: EA/00019/19
Project Title: Demolition of existing buildings; part excavation for one basement level; construction of parking; medium-rise building for Class 4A offices from the 1st floor up to the 7th floor; conventional development for remaining parts of medium rise building and all other blocks including small scale supermarket and Classes 4A, 4B, 4C and 4D.
Location: Toyota /Debono Site, Triq l-Imdina c/w Triq Ganni Bonnici, Triq is-Siggiewi, Zebbug
Project Description Statement:
EIA Screening Report:
Date Uploaded:
30/07/2019
EIA Required: No
Status: EIA process suspended
PA 1821/19: Demolition of existing buildings; excavation for three levels of parking; construction of parking; medium-rise building using the Floor Area Ratio Policy (Class 4A) for part of the site; conventional development for remaining part of site (Class 3C, 4A, 4B, 4C, 4D).
PA 879/23: Demolition of existing buildings; part excavation for one basement level; construction of parking; medium-rise building for Class 4A offices from the 1st floor up to the 7th floor; conventional development for remaining parts of medium rise building and all other blocks including small scale supermarket and Classes 4A, 4B, 4C and 4D.
Revised Project Description Statement:
Revised EIA Screening Report:
Date Uploaded:
13/03/2023
EIA Required: No
Status: Awaiting further submissions
ERA’s Assessment & Recommendation:
Date Uploaded:
13/03/2023
Traffic Noise study: PA 879/23 - Traffic Noise study
Air Quality Study: PA 879/23 - Air Quality Study
ERA's Assessment and Conditions : ERA's Assessment and Conditions
Responsible authorities and nature of decisions:
- the authority responsible for the Environmental Impact Assessment process: ERA
- the nature of the decisions to be taken: development consent decision
- the authorities responsible for the development consent decisions: Planning Authority