PA File No.: PA/04689/18
ERA Reference: EA/00041/18
Project Title: To sanction existing partly backfilled quarry. To carry out Land Contamination investigation. To excavate and transport, from and to site, existing top soil stock pile. To form temporary ramp in order to remove top soil stock pile. To remove and dispose as instructed of any land fill contaminants. To backfill quarry to indicated levels with inert waste. To spread over site existing soil from stockpile to an approximate depth of one metre and to build rubble wall terraces.
Location: Site at (Disused Quarry), Ta' Wied Costa, Siggiewi, Malta
Project Description Statement:
EIA Screening Report:
Status: Concluded
ERA’s assessment & recommendation:
Responsible authorities and nature of decisions:
- the authority responsible for the Environmental Impact Assessment process: ERA
- the nature of the decisions to be taken: development consent decision
- the authorities responsible for the development consent decisions: Planning Authority