PA File No.: PA/04713/18; PA/04838/18; PA/01351/23
ERA Reference: EA/00002/19
Project Title: To demolish existing factory and excavate four floors of underground parking, construction of retail outlets (class 4B) at ground floor and construction of offices (class 4A) at first, second, third and fourth floor, construction of substation and erection of signs
Location: Ex Pasta Factory, Triq Hal-Qormi c/w, Triq l-Iskultur, Qormi, Malta
Project Description Statement:
EIA Screening Report:
Date Uploaded:
09/04/2019
EIA Required: No
Status: Concluded
PA/01351/23 - Project Title: To demolish existing pasta factory including existing substation, to excavate site to the required levels. To construct underground reservoir. To construct basement levels -3 and -2 for vehicles car parking (176 car spaces). To construct basement level -1 for the parking of commercial vehicles (61 number vehicle spaces). To construct two levels of warehouse class 5A (levels 0 and1), to construct three other levels (levels 2, 3 and receded floor level) of warehouses class 5A but with a reduced floor height. Relocation of new substation.
PA/01351/23 - Project Description Statement: Schedule II - PDS
PA/01351/23 - Screening report: ERA Assessment and Recommendations
Date uploaded: 16/01/2024
Responsible authorities and nature of decisions:
- the authority responsible for the Environmental Impact Assessment process: ERA
- the nature of the decisions to be taken: development consent decision
- the authorities responsible for the development consent decisions: Planning Authority