(i) PA/05924/18 - Construction of multi-use development applying the Floor Area Ratio (FAR) for medium rise buildings within the parameters of previous approved PC 38/16. The proposal shall include the excavation of site to make provision for 2 basement levels of parking facilities, 1 basement level including a supermarket, Class 3 Gymnasium and other related storage facilities. Class 4D outlets and 1 Class 2C child day care center are being proposed at piazza level, Class 4A offices at level 1 and overlying 113 Class 1 residential units over 8 floors.
(ii) PA/0242721 - To develop an existing open car-park and to propose the construction of Multi-Use development applying the Floor Area Ratio (FAR) for medium rise buildings within the parameters of previously approved PC 38/16. The proposed development will include 2 separate buildings one of 9 floors and a receded floor and another of 7 floor and a receded floor respectively. The proposal includes excavation of 3 basement levels including 58 garages, 305 parking spaces and 6 obstructed parking spaces, 1x Class 3 Gym and spa with indoor pool, and other related storage facilities. The proposal also includes 2x Class 4D outlets, 1x Local Bar, 1x Class 2C Child Care Center and 10x Class 4B local shops and overlying 136 residential units over 9 floors.
- the authority responsible for the Environmental Impact Assessment process: ERA
- the nature of the decisions to be taken: development consent decision
- the authorities responsible for the development consent decisions: Planning Authority