Decisions taken in public by the ERA Board in its sitting of 12/12/2025

All permits are available from this link or by logging into ERIS

Application Number ProposalLocalityDecisionDecision Date
EP 00258/25*Application for the renewal and modification of EP 00019/21, to carry out waste management operations related to WEEE storage by WEEE (Malta) Limited, at tar­-Robba Recycling Plant, MarsaMarsaApproved12/12/2025
EP 00278/25*Application for the backfilling of a softstone quarry at SM49, Tax-Xantin, Imqabba as submitted by Ms Marica Micallef.Imqabba Approved12/12/2025
EP 0011/23/V1 Application for the Variation of EP 00011/23 in view of Regulation (EU) 2023/1542 concerning batteries and waste batteries, for the Batteries PRO Environmental Permit in the name of GreenPak Battery Recycle.FguraApproved12/12/2025
EP 0009/23/V1 Variation to EP 00009/23 to amend the Schedule in view of addition of sub-categories for Temperature exchange equipment Category 1 to the Placement on the Market table in Schedule A2 of Annex 1 for the WEEE Recycle, WEEE Collective OrganisationFguraApproved12/12/2025
EP 00010/23/V1Variation to EP 00010/23 to amend the Schedule in view of addition of sub-categories for Temperature exchange equipment Category 1 to the Placement on the Market table in Schedule A2 of Annex 1 for the WEEE Malta Ltd, WEEE Collective OrganisationMqabbaApproved12/12/2025
IP 0002/13/B*Application for the extension of IP 0002/13/B in relation to an IPPC permit for the operation of Metalco Ltd for the temporary storage of hazardous waste in Valletta Road, Luqa.LuqaApproved12/12/2025
IP 0004/07/C/V2 Request for extension of validity for the IPPC permit for the operation of the Thermal Treatment Facility, located in Marsa and operated by WasteServ Malta Ltd.MarsaApproved12/12/2025
EP 0147/25Application for the renewal and modification of EP 0002/21, for the acceptance and recycling of construction and demolition waste, back filling of excavation void and operation of a concrete batching plant at quarry SM04, at tad-Debbiet, Siġġiewi.SiġġiewiPostponed12/12/2025
*Indicates non-executability of decision in view of pending post-decision requirements.