Consultations on Permitting Applications

Case Number Name of Applicant Name of Site Category Description Locality Start Date End Date
EP 0190/26Mr. Stephen AzzopardiQuarry SG08Activity 1.4: Quarry operations, which may include stone extraction and, or the recycling of inert waste or construction and demolition waste (#)San Lawrenz25/06/202615/07/2026
EP 1344/23/V1Project Green1.23 - Interventions on more than 10 protected treesVarious sites23/06/202603/07/2026
EP 00154/26Antoine VellaQuarry Ex-HM 091.5 - Backfilling of excavation voids as defined by the Waste Management (Management of Waste from Extractive Industries and Backfilling) Regulations (S.L. 549.50.) Qrendi23/06/202613/07/2026
EP 0061/25Mr. Silvio BuhagiarDisused Quarry at Srug StreetCategory 1.11: Depot carrying out temporary storage of construction and demolition waste and preparation for reuse, recycling or recovery of such waste (#)Xaghra15/06/202606/07/2026
EP 0073/19Maghtab Construction Ltd.'Batch Plant'2.6: Manufacture or processing of asphalt or other non-metallic min-eral products, including batching plants, but excluding temporary plants.Naxxar11/06/202601/07/2026
EP 00112/26Martin AgiusPH Agius & Sons Ltd2.6 - Manufacture or processing of asphalt or other non-metallic mineral products (including batching plants) but excluding temporary plants 1.11 - Depot carrying out temporary storage of construction and demolition waste and preparation for reuse, recycling or recovery of such wasteŻebbuġ, Malta10/06/202630/06/2026
EP 00031/26Ciro Ascione obo Refab Light Blue PartnershipRefab Light Blue Partnership1.9 Other waste management operations, not listed elsewhere in this Schedule, and other operations within the scope of the Waste Regulations (S.L. 549.63), except works requested by the Authority for the purpose of site remediation or restoration, stabilisation of material or other environmental improvement. 1.10 Non-hazardous waste collection, treatment, disposal, temporary storage and, or preparation for reuse (including packaging, sorting and, or processing of waste prior to reuse or recovery), except waste generated on the same site.Zebbug Malta08/06/202628/06/2026