Decisions taken in public by the ERA Board in its sitting of 09/01/2026

All permits are available from this link or by logging into ERIS

Application Number ProposalLocalityDecisionDecision Date
EP 0072/25*Application for the operation of a depot carrying out temporary storage of construction and demolition waste and preparation for reuse, recycling or recovery of such waste at ABB Ltd., Iklin IklinApproved09/01/2026
EP 0042/25*Application for the operation of a concrete batching plant to carry out End-of-Waste activities on contaminated material within the facility of the Malta International Airport as submitted by the Malta International Airport.LuqaApproved09/01/2026
IP 0001/06/C/V1*Application for the variation of IP 0001/24 for the conversion of an unused hazardous cell into a non-hazardous cell, including extension of cell boundary for landfilling at Għallis Non-Hazardous Landfill.NaxxarApproved09/01/2026
*Indicates non-executability of decision in view of pending post-decision requirements.