Location of MCP:
Simonds Farsons Cisk plc, The Brewery, Mdina Road, Mrieħel BKR3000
Locality:
Mrieħel
Permit Number:
EP 0054/19
Number Of MCP's at Installation:
3
MCP 1
Type of MCP:
Boiler
GIS Co-Ordinates :
35.891028, 14.464833
Stack height:
44m
Fuel Type:
Gas oil
Expected Annual No. of Operating Hours:
2332
Average Load in Use:
60
Date of Start of Operation:
01/01/1996
Yearly Waste Gas Flow Rate:
21661473 m3/year Nm3/hour
Fuel Used per Annum:
421,960 litres
Emission Limit Values
CO:
No Emission Limit Value
NOx:
200 mg/Nm3
MCP 2
Type of MCP:
Boiler
GIS Co-Ordinates :
35.891028, 14.464833
Stack height:
44m
Fuel Type:
Gas oil
Rated Thermal Input (MWth): ≥ 1 ≤ 5 MWth
Expected Annual No. of Operating Hours:
6990
Average Load in Use:
80
Date of Start of Operation:
01/04/20
Fuel Used per Annum:
355410 litres
Emission Limit Values
CO:
No Emission Limit Value
NOx:
200 mg/Nm3
MCP 3
Type of MCP:
Boiler
GIS Co-Ordinates :
35.891028, 14.464833
Stack height:
44m
Fuel Type:
Gas oil
Rated Thermal Input (MWth): ≥ 1 ≤ 5 MWth
Expected Annual No. of Operating Hours:
2330
Average Load in Use:
80
Date of Start of Operation:
01/01/19
Fuel Used per Annum:
327502 litres
Emission Limit Values
CO:
No Emission Limit Value
NOx:
200 mg/Nm3