PA File No.: PA/00578/24; PA/04375/23; PA/00363/24
ERA Reference: EA/00060/26
Project Title: To demolish existing stores and garages as approved in PA/5849/09, excavate site and construct 3 levels of basement parking, ground floor warehouses Class 6A and Class 4A office. Application includes placing of pv panels at roof level.; To demolish existing garages, office block and stock bays (approved via PA5849/09), excavate site in area of garages to construct 2 levels of basement parking, ground floor garages and overlying ancillary Class 4A offices. Proposal includes relocation/construction of new stock bays, repositioning of Weigh Bridge and construction of ancillary Class 4A office adjacent to stock bays. Additionally pv panels will be installed over roof level.: To sanction removal of part-of fill from old quarry (the latter to be mostly used as recycled stone for the construction of rubble walls) and formation of underground link between old quarry and existing Plant approved by PA 5849/09. Application proposes the removal of the remaining fill (to be used as recycled stone for rubble walls), placing of mobile crusher to recycle general excavation clean-waste and refilling of old quarry with excess unrecyclable material over an estimated period of 20 years. Application also includes the placing of top-soil once quarry is backfilled, reconstruction of existing rubble boundary-walls and sanctioning of gate.
Location: St. Joseph Yard, Triq l-Imqabba, Mqabba; Zahra Group, Triq l-Imqabba, Triq tas-Sejba and, Triq Tas-Sejba, Sqaq Nru.2, Mqabba; Ex-quarry, Tax-Xaghri L-Imqalleb, Mqabba
Project Description Statement:
EIA Screening Report:
Date Uploaded:
06/05/2026
EIA Required: No
Status: Concluded
Other Documents:
Responsible authorities and nature of decisions:
- the authority responsible for the Environmental Impact Assessment process: ERA
- the nature of the decisions to be taken: development consent decision
- the authorities responsible for the development consent decisions: Planning Authority