PA/04863/22
|
The proposed construction of a Material Recovery Facility (MRF) for the processing of grey bag and recovery of different streams of materials. The proposal includes ancillary office space, staff quarters and parking spaces. |
ECOHIVE Complex, Naxxar. |
Pre-submission
|
Construction of an Organic Processing Plant in Malta |
ECOHIVE Complex, Naxxar. |
PA/04448/22
|
Construction of the second cable link inter-connector Project. The proposal includes trenching, laying, cable jointing and installation between the Enemalta132kV Maghtab Terminal Station and the near shore approach, construction of underground joint bays, a trench-less transition from onshore to offshore and the laying and protection of the submarine cable up to the median line between Maghtab, Naxxar Malta and Ragusa, Sicily. |
Maghtab Terminal Station, Naxxar up to the median line between Malta and Italy, Il-Maghtab, Naxxar |
PA/05420/21
|
Amended Application to PA 3134/19 – Construction of Corinthia Oasis – Works include amendments to previous permit – Construction of Hotel and 25 Residences |
Corinthia Oasis (ex Hal Ferh Complex), Triq il-Kappella Tal-Militar, Triq inNahhalija, Mellieha. |
PA/08471/19 & PA/04783/20
|
Construction of a berm and revetment including dredging at Valletta Grand Harbour & Construction of new Breakwater arm beneath St. Elmo to offer protection to the Grand Harbour during North Westerly storms |
Site at Valletta Grand Harbour, Il-Port Il-Kbir, Belt Valletta |
PA/08809/19
|
Upgrading of the existing Marsa Racecourse to an International standard Racecourse, including demolition of existing grandstand and structures; restoration of the MRC building; upgrade and extension of the racetrack; upgrade of polo pitch; construction of Grandstand; construction of Class 4C and 4D outlets; construction of 2 club houses; construction of stables and paddocks; construction of equestrian arena with grandstand; construction of an additional 4 floors of car parking over the Marsa Park and Ride; construction of bridge between car park and race track; construction of childcare centre; construction of commercial development including Classes 4A and 4B; and other ancillary facilities to the racecourse. |
Il-Korsa taz-Zwiemel u l-Marsa Park and Ride, Triq it-Tigrija c/w Triq l-Iljun, Triq Aldo Moro, Marsa |
PA/02454/19
|
Outline application to excavate three floors below existing level, and construction of basement level -3 garage for 380 cars, basement level -2 for storage in conjunction with Pama Supermarket and formation of underground link to existing Pama stores, basement level -1 retail class 4B, ground floor (road level) entrance lobby building and landscaped garden over development and new vehicular entrance to Pama Supermarket from Pantar Road |
Site at, Triq Pantar, Mosta |
PA/04576/19
|
Relocation of kerbside fuel station MRA/KPRS/105 from Pjazza San Nikola – Siggiewi to a site on Triq Mons.Mikiel Azzopardi – Siggiewi and construction of servicing garage at basement, ancillary office and shop Class 4B, car wash, ATM and landscaping at ground floor level. |
Site on, Triq Mons. Mikiel Azzopardi, Siggiewi |
PA 07288/19
|
Mining of ex Luqa Landfill in order to lower the existing levels to prepare site for extension of Industrial estate and new sports facilities. |
Luqa Park, Triq Valletta, Luqa. |
PA 09307/18
|
To relocate existing petrol station at Testaferrata Street, Ta’ Xbiex to new Petrol Station including workshop retail shop Class 4B, offices and staff facilities and car wash. |
Ta' San Martin, Triq l-Imdina, Attard, Malta. |
PA04375/19
|
Demolition of existing office, factory and storage buildings together with part demolition/retention of the mixed showroom/office building on the corner of Triq L Imdina and Triq San Gwakkin. Proposals are for construction of new buildings to include Class 4A Offices, Class 4B Retail and Class 4C/D Food & Drink accommodation |
Fino Buildings, Triq Notabile & Triq l-Imdina & Triq San Gwakkin & Triq il-Furnara &, Triq l-Artigjanat, Mriehel, Birkirkara, Malta |
PA 02467/16
|
To demolish existing building, excavation of site. Consolidation of existing structures and construction of old people’s home (class 2a). (Site covered by outline permit PA 05998/05). |
Site at Buskett Forest Aparthotel, Triq ta' Sabbat, Ta' Sabbat, Dingli, Malta |
EA 00018/16
|
Malta-Gozo Tunnel |
Malta, Gozo. |
PA/01820/18
|
Sand Replenishment of Ghadira Bay, including the construction of a wave deflection and related Marine works. |
Il-Bajja tal-Mellieha, Triq il-Qammieh and, Triq l-Marfa, Ghadira, Mellieha, Malta |
PA 02910/16
|
Construction of an elderly residence |
Triq Hal-Luqa, Luqa, Malta |
PA/02897/16
|
Beach replenishement project with ancilliary facilities |
Site at Ir-Ramla Tal-Pwales, Xatt il-Pwales, San Pawl il-Bahar, Malta |
PA 04905/10
|
Development of coastal defences against wave incidence on shore for Marsalforn Bay including: beach nourishment; construction of groin; upgrade of storm water channel and construction of submerged breakwater. Site at, Marsalforn Bay, Marsalforn, Zebbug (Gozo), Gozo |
Site at, Marsalforn Bay, Marsalforn, Zebbug (Gozo), Gozo. |
PA 05987/08
|
Construction of fuel station and ancillary facilities at Triq Dun Karm, L-Iklin |
Triq Dun Karm, L-Iklin |