Reference No. | Project Title | Location | EIA Screening Outcome | MEMO to ERA Board | Final Assessment Issued By The Authority |
---|---|---|---|---|---|
PA/04863/22 | The proposed construction of a Material Recovery Facility (MRF) for the processing of grey bag and recovery of different streams of materials. The proposal includes ancillary office space, staff quarters and parking spaces. | ECOHIVE Complex, Naxxar. | 06/02/2023 |
||
PA/04448/22 | Construction of the second cable link inter-connector Project. The proposal includes trenching, laying, cable jointing and installation between the Enemalta132kV Maghtab Terminal Station and the near shore approach, construction of underground joint bays, a trench-less transition from onshore to offshore and the laying and protection of the submarine cable up to the median line between Maghtab, Naxxar Malta and Ragusa, Sicily. | Maghtab Terminal Station, Naxxar up to the median line between Malta and Italy, Il-Maghtab, Naxxar | 14/08/2023 |
||
PA/03927/19 | Proposed alterations and construction of a water polo and swimming pool, deck area, changing rooms, toilets, showers, committee meeting room and ancillary facilities | San Giljan Aquatic Sports Club, Triq Gorg Borg Olivier, San Giljan | 14/08/2023 |
||
PA/04710/18 & PA 437/23 | Demolition of the ex-Jerma Palace Hotel, excavation of site and construction of a mixed use resort consisting of 155 Residential Units (Class 1), Tourism Accommodation (Class 3b) consisting of 258 Serviced Apartments and a 134 Room 5 Star Hotel, Retail (Class 4B) and Food & Beverage outlets (Class 4C and Class 4D), a below grade shopping mall (Class 4B) , 570 Parking spaces, and 13,600sqm of open space available to the general public. The proposal consists of the construction of a two storey basement below the landscaped public plaza and two eight storey blocks above the plaza, extensive landscaping works, repairs and changes to the existing coastal defenses and the construction of a swimming pool on the existing concrete platform below the project. | Site at, Jerma Hotel, Triq is-Salini, Marsascala, Malta | 28/01/2019 03/04/2023 |
||
PA/08500/21 | Proposed garden centre including ancillary class 4D cafeteria, tree nurseries and kennel at level +0, visitor parking and groomer at level -1, ancillary stores at level -2 and infilling of quarry. | Tas-Sejba Recycling Plant, Triq tas-Sejba, Triq il-Parrocca, Sqaq Nru. 1, Mqabba | 09/02/2023 |
||
PA/06860/21 | Storm water relief tunnel to relieve flooding problems near Mater-Dei Hospital roundabout. | Site at, Triq Sir Anthony Mamo, San Gwann; Triq Sir Anthony Mamo, Birkirkara, Triq Dun Karm, Msida | 06/02/2023 |
||
No Reference Number | Installation and commissioning of a Battery Energy Storage System (BESS) at Delimara Power Station | Site at Delimara Power Station, Marsxlokk | 09/06/2023 |
||
PA/03156/22 | Coastal protection works at Ghar Lapsi (East Cove) consisting in the shifting of rock boulders from quay and seabed to protect the toe of the cliff to reduce rate of erosion and further collapse (as already happened in 2016) by wave action. Works also entail the repair of the existing damaged concrete platform adjacent to existing slipway for public use. | Ghar Lapsi, Ghar Lapsi, Siggiewi | 11/07/2023 |
||
Pre-submission | Installation and commissioning of a Battery Energy Storage System (BESS) at the A-Station Tunnel in Marsa | Site located within the A-Station Tunnel, Marsa | 22/06/2023 |
||
PA/01821/19 & PA 879/23 | Demolition of existing buildings; part excavation for one basement level; construction of parking; medium-rise building for Class 4A offices from the 1st floor up to the 7th floor; conventional development for remaining parts of medium rise building and all other blocks including small scale supermarket and Classes 4A, 4B, 4C and 4D. | Toyota /Debono Site, Triq l-Imdina c/w Triq Ganni Bonnici, Triq is-Siggiewi, Zebbug | 30/07/2019 13/03/2023 |
||
PA/04962/22 | Proposal to construct Regional Health Centre, at Triq il-Port Ruman, C/W Triq il-Maskli, Triq Domenico De Nizza, Triq il-Fliegu, San Pawl il-Bahar | Triq il-Port Ruman, c/w Triq il-Maskli, Triq Domenico De Nizza, Triq il-Fliegu, San Pawl il-Bahar | 20/07/2023 |
||
PA/02053/20 & PA/06425/20 | Proposed Network Upgrading of Msida Creek including flyover at Misrah 5 t’Ottubru and misrah il-Menqa, road widening at Triq Marina, roundabout junction at Triq il-Wied tal-Imsida and two pedestrian bridges at Triq Marina and Misrah Guze Ellul Mercer; and Junction upgrading at p/w Triq Wied tal-Imsida. | Msida Creek, ix-Xatt ta' Xbiex,Triq Guze' Ellul Mercer, Triq Marina, Xatt lImsida, Misrah il-Hamsa ta' Ottubru, Misrah tal-Menqa,Triq il-Wied talImsida,Triq M. A. Vassalli, Triq D' Argens, Msida; and Site at, p/o, Triq il-Wied tal-Imsida, Msida. | 26/02/2021 |
||
PA/04712/20 | Proposed installation of photovoltaic farm infrastructure over restored quarry including ancillary services. | Tal-Hagra, Triq Tas-Sejba c/w, Triq il-Madonna tal-Gilju, Mqabba | 17/09/2021 |