Requirements for compositional analysis

Current limits for compositional analysis applied by ERA

HP assessment from WFD

Analysis of leachability against Waste Acceptance Criteria (CD 2003/33/EC; WAC)

Comparison against Dumpling Limit Values (DLV)

Flowcharts for the site study procedure can be seen and downloaded from below.

Works planned
onsite
Works planned...
Is site potentially
contaminated?
Is site potentially...
Further assessment not required
Further assessmen...
No
No
Site Study Procedure
Site Study Procedure
Further assessment required 
Further assessmen...
Yes
Yes
What is being
proposed to do the material?
What is being...
Material is not to be disturbed
Material is not to be di...
Compositional analysi...
Not contaminated
Not contaminated
Contaminated
Contaminated
No further treatment
required
No further treatm...
Applicant to propose site containment or rehabilitation technique  
Applicant to propose s...
Material is intended to be used either on/off - site without further treatment
(not yet considered waste)
Material is intended to...
Compositional analysi...
Results below Residential levels 
Results below Res...
Adequate evidence of further use?
(e.g. contractual agreements)
Adequate evidence of fu...
Results above Industrial levels
Results above Ind...
Refer to
Section 2: Waste Characterisation
Refer to...
Material intended for on/off - site Disposal / Treatment / Backfilling
(considered waste)
Material intended for on...
Is site for industrial use?
Is site for industr...
Offsite Use
Offsite Use
No further requirements
No further requirements
Yes
Yes
Considered waste
Considered waste
No
No
Section 1: Determination of Use
Section 1: Determination of Use
Applicant is to note that different analytical analyses may be required based on the determined fate of material.
Applicant is to note that diffe...
Results above Residential & below Industrial levels 
Results above Resi...
Offsite Use
Offsite Use
No
No
Yes
Yes
Onsite Use
Onsite Use
Text is not SVG - cannot display