Reference No. Project Title Location
PA/08471/19 & PA/04783/20 Construction of a berm and revetment including dredging at Valletta Grand Harbour & Construction of new Breakwater arm beneath St. Elmo to offer protection to the Grand Harbour during North Westerly storms Site at Valletta Grand Harbour, Il-Port Il-Kbir, Belt Valletta
PA/03927/19 & PA/06663/24 Proposed alterations and construction of a water polo and swimming pool, deck area, changing rooms, toilets, showers, committee meeting room and ancillary facilities San Giljan Aquatic Sports Club, Triq Gorg Borg Olivier, San Giljan
PA/04576/09 Proposed Coastal Sea Defences including: (a) repairs and increase in height to existing secondary bre​ak water arm at Delimara, (b) Construction of new arm at Ponta tal-Qrejten Secondary Break Water ARM, Delimara Power Station, Delimara, Il-Ponta Tal-Qrejten off, Triq Il- Barrakki, Marsaxlokk, Malta
PA/01821/09 ​Outline application for wind farm including laying of power cables between turbines. ​Off Shore, Sikka l-Bajda, L/O Mellieha
PA/05376/06 Proposed lido Site at, Triq Ix-Xatt, Gzira