PA/04777/20
|
Proposed demolition of existing hotel at San Niklaw Bay and existing bungalows at Santa Marija Bay. The proposed development consists of part excavation and the construction of Class 3B Hotel (140 beds) at San Niklaw Bay area and individual serviced Bungalows (21 units) at Santa Marija Bay area with ancillary facilities and amenities including Spa (class 3C), bars/lounges (Class 4C) and restaurants (class 4D), upgrading the existing berthing facilities (class 3D); construction of swimming pools; reservoirs; complete upgrade of the infrastructure systems and back of house facilities. Upgrading and reinstatement of the natural ecological and existing disturbed terrain in both San Niklaw and Santa Marija areas in accordance with the Gozo and Comino Local Plan |
Comino Hotel and Bungalows, Gzira ta' Kemmuna, Kemmuna, Ghajnsielem |
PA/09876/19 and PA/01948/20
|
Redevelopment of Mellieha Bay Hotel |
Mellieha Bay Hotel, Triq il-Marfa, Ghadira, Mellieha |
PA 08969/19
|
Demolition of existing structures, ramp, gates, rubble and boundary walls. Uprooting and planting trees. Proposed rehabilitation of disused soft stone quarry, including filling of same and landscaping works. Proposed construction of old peoples home ( class 2A ) that comprises of basement (level -1 ), three floors (levels 0,1,2) above ground and roof structures at level 3. The basement level consists of a car park having 137 parking spaces, 6 accessible parking spaces and 1 accessible van space, an unloading/loading area, kitchen, dining areas and ancillary facilities. Level 0 consists of a reception area, lounge, multi purpose hall, accommodation (42-2-bedded guest rooms ) and ancillary facilities. It also includes a wandering garden, other gardens and a parking space, a space for a fire truck and minibuses, ramps leading to the basement level and a security room. Level 1 consists of a staff area, lounge, accommodation ( 42-2- bedded guestrooms) chapel and ancillary facilities. The roof level is an area for services. |
SM61, Triq il-Belt Valletta, Mqabba |
PA 02943/19
|
It is proposed to demolish existing Hotel, Excavate and Construct a new Class 3B Hotel having 400 Rooms, class 3C Gym, class 3D Diving Centre & water sports facilities, class 4B Retail outlets, class 4D bars, class 4D Restaurants & ancillary facilities including an indoor and an outdoor pool, parking area plus multipurpose halls. |
Ramla Bay Resort, Triq ir-Ramla tal-Bir, Marfa, Mellieha. |
PA 01892/19 & PA 00055/17
|
To demolish the Go-Exchange building and excavate site to construct and extension to the car park, residential dwellings, retail, hotel and other ancillary facilities. |
Mercury House Site and Go-Exchange Building, Triq San Gorg, Triq Sant Andrija, Triq Elija Zammit, Triq Gdida, fi Triq Sant' Andrija, San Giljan |
PA/02470/16 & PA/06097/20
|
Demolition of existing dwellings and construction of a comprehensive project including excavation and construction of underground parking and the construction of a multi-storey commercial complex which will accommodate mixed use development over a height of 33 floors (Tower PX) |
Triq Santu Wistin /, Triq Sant Andrija, San Giljan, Malta |
PA/06044/17 and PA/06714/20
|
Redevelopment of the Grand Verdala Hotel |
Former Grand Hotel Verdala, Triq Inguanez across, Triq Ir-Rghajja, Rabat, Malta |
PA/05732/17
|
Outline Permit – Demolition of existing licensed explosives factory & re-development onto Eco-spa & resort Class 3A. Development includes excavation of site for accommodation of facilities. |
Pulvic Explosives Factory, off Triq il-Qaws, Dingli, Il-Qaws, Rabat, Malta​ |
PA/01029/18
|
Excavation of site to sea level and construction of mixed use development consisting of the following elements: Underground car park on three levels, a commercial complex ( including Class 4B, 4C , 4D) over two partially below ground levels and with a frontage onto the existing Laguna Walk, an elevated residents plaza with communal pool and landscaping, and an overlying residential complex on eleven floors |
Plots 3 & 4, Smart City, Ricasoli, Kalkara, Malta​ |
PA/03807/17
|
Proposed City Centre multi-use development, including excavation of former ITS site & Wesghet Lewis V. Farrugia/Wesghet George Portanier, demolition of modern structures, sanctioning of partly demolished non-scheduled building, retention of Grade 2 scheduled buildings and Cold War substation, construction of a 5 Star Hotel (386 rooms) Class 3B, 179 residences, commercial office space (Class 4A), shopping mall (Class 4B) and restaurants (Class 4C and 4D) and basement / surface car park. The proposal also includes the retention and integration of Grade 2 military blocks, Cold War substation and integration of other existing structures. |
Former ITS Site, Wesghet George Portanier & Wesghet Lewis V. Farrugia, Triq il-Profs. Walter Ganado, Triq Pietru D'Armenia, Pembroke & Triq il-Profs. Walter Ganado, Ix-Xatt ta' San Gorg, San Giljan, Malta |
PA/03782/16
|
The proposed development consists of a 125 bedroom hotel Class 3B, amenities and semi-basement parking / service level inline with the brief guidelines stated in “Marsaxlokk inner harbour area environment and development brief” public consultation draft 2014. |
Hunters Tower Restaurant, Triq Il- Wilga, Marsaxlokk, Malta​ |
PA/02767/16; PA/08894/20
|
Redevelopment of an existing derelict hotel including environmentally friendly measures and provision of public ancillary facilities; and Change in layout and distribution of uses of approved hotel (PA/2767/16) to achieve: an increase in public open space and extending landscaped areas including roof tops and terraces. Removal of lower basement level and reduction in the overall height level. |
Delimara Bay Hotel, Triq Delimara, Marsaxlokk, Malta |
PA/02906/16
|
Retention of historic existing facades of the Fort Cambridge Barracks building, demolition of existing South West facade and internal structure. Proposed excavation of 4 basement levels for services and ancillary facilities to be connected to approved car park at basement 2 level and construction of multistorey Hotel Tower Class 3B including all ancillary facilities and amenities. |
Site at, Triq Tigne c/w, Triq Il- Ponta Ta' Dragut, Sliema, Malta. |
PA/01191/05; PA/01398/23
|
Excavation of the site and construction of underground parking and service facilities. Construction of low rise buildings including a 38 storey tower, in a pedestrianized mixed development of retail and office outlets, food and beverage outlets, and residential units. Change of use of Villa Drago to cater for retail and food and beverage establishments. |
Old Union Club, (between) Tower Road, Hughes Hallet Street, Tiqne Street, Qui Si Sana Lane, Ix- Xatt Ta' Qui-Si-Sana, Sliema |
PA/01856/21
|
Construction of residential villas as per North Harbours Local Plan Policy NHSW08 and PC/00073/17 |
Site at (Undeveloped land), Triq il-Kajjarum c/w Triq il-Madliena c/w Triq Esprit Barthet/ Triq in-Nafra c/w, Triq il-Militar, Swieqi |
PA/04962/22
|
Proposal to construct Regional Health Centre, at Triq il-Port Ruman, C/W Triq il-Maskli, Triq Domenico De Nizza, Triq il-Fliegu, San Pawl il-Bahar |
Triq il-Port Ruman, c/w Triq il-Maskli, Triq Domenico De Nizza, Triq il-Fliegu, San Pawl il-Bahar |
PA/00452/23
|
Construction of underground basement parking, showroom at ground floor and offices Class 4A at upper levels with a different layout from that approved in permission PA/1017/09. Changes include addition of one basement level for parking and a receded level for office use. |
Vacant Land, Triq l-Imdina, Zebbug |