PA/08471/19 & PA/04783/20
|
Construction of a berm and revetment including dredging at Valletta Grand Harbour & Construction of new Breakwater arm beneath St. Elmo to offer protection to the Grand Harbour during North Westerly storms |
Site at Valletta Grand Harbour, Il-Port Il-Kbir, Belt Valletta |
|
PA/02106/21
|
Coastal defence system at Marsalforn Bay consisting of the reconstruction of Santa Marija breakwater, construction of a rubble mound berm on the Menqa site, two rubble mound groins at the valley outfall and replenishment of the beach. |
Site at, Il-Bajja Ta' Marsalforn, Marsalforn, Zebbug (Gozo) |
Yes |
PA/04687/10
|
Proposed scuttling of the M/T Hephaestus at a site off Ix-Xatt l-Ahmar, south coast of Gozo, to create a new diving attraction |
Site off Xatt l-Ahmar, south coast of Gozo |
Yes |
PA/01254/09
|
To scuttle “Tugboat TUG 2” off Exiles Coast |
Exiles Coast, Sliema at N 35 ° 55.26899' & E 14 ° 29.97863 |
Yes |
PA/06431/20
|
Proposed mooring bays, Kalkara. |
Kalkara |
No |
PA/05429/20
|
Construction of a mooring facility and shelter at Ta’Xbiex Seafront. |
Ta' Xbiex Seafront, Ta'Xbiex |
No |
PA/02160/21
|
Sand replenishment pilot study at Southern Ghadira Bay, including the construction of a groyne |
Site at, Triq il-Marfa, Ghadira, Mellieha |
No |
PA/08622/20
|
Demolish existing breakwater, and construct a new breakwater designed to accommodate wave and sea conditions due to changing climatic conditions, with new mooring facilities for boats, new ferry landing facilities, including a terminal for passengers and to provide better access to users. Bugibba. |
Bugibba Breakwater, Dawret il-Gzejjer, Bugibba, San Pawl il-Bahar |
No |
PA/01602/20
|
Upgrading and extension of Lascaris Wharf |
Quay at, Xatt Lascaris, Belt Valletta |
No |
PA/08472/19
|
Construction of a new cargo facility at Ras Hanzir. |
Quay at, Ras Hanzir, Kordin, Paola |
No |
Pre-Submission
|
Temporary construction of two groynes in Marsaxlokk bay as a measure to reduce littoral drift. |
Site at Quay at, Marsaxlokk Bay, Marsaxlokk |
No |
PA/03601/21
|
Proposed scuttling of the former AFM Patrol Boat “P33” to consolidate the existing dive |
Site off, Zonqor Point, Marsascala |
No |
PA/04992/21
|
Proposed beach re-nourishment project |
Il-Bajja tax-Xama', Sqaq tax-Xama', San Pawl il-Bahar |
No |
PA/03858/20
|
Re-construction of dilapidated concrete piers |
It-Trozz, Il-Bajja Tal-Gnejna, Mgarr |
|
PA/07323/16
|
Proposed extension to Grand Hotel Excelsior Hotel. Extension comprising of an additional new wing consisting of 104 rooms plus additional two floors consisting of 92 rooms over part of existing hotel footprint plus three new exhibition halls with proposed underground parking, additions to existing outdoor pool area consisting of a new pool, bar area, lagoon plus extension to beach area plus proposed new bar/restaurant area. |
Grand Hotel Excelsior, Triq L- Assedju Il- Kbir, Triq Sir Hannibal Scicluna, Floriana, Malta |
Yes |
PA/05103/21
|
Quay extension seaward to achieve a linear jetty, dredging and disposal of seabed material |
TM Fast-Ferry Terminal, Xatt il-Barriera, Belt Valletta |
No |
PA/05952/21, PA/06179/21, PA/07802/22 and PA/02713/23
|
The redevelopment of the seaside lidos belonging to the Sunny Coast Hotel, Luzzu, and the Seashells Resort at Suncrest Hotel – retaining their primary use as ancillary functions to the hotels; integrating a parking facility at basement level; and redistributing street level commercial outlets to be integrated within a large scale network of pedestrianised urban spaces: including the creation of a widened promenade walk, the provision of piazzas and pedestrian routes, and the upgrading of the open space in front of the Sunny Coast Hotel. To include for the demolition of existing structures and the excavation of the site. The redeveloped site includes: an underground delivery area and a parking facility (Class 3B and 3C) at basement level; ancillary functions to the hotels at lido level which include indoor and outdoor pools and pool deck (Class 3C), food and beverage outlets (Class 4D), a conference centre (Class 3C), a spa and leisure centre (Class 3C) and related ancillary back of house facilities (Class 3B and 3C); and pedestrianised, accessible urban spaces in the form of piazzas, gardens and walkways integrated with a conference centre (Class 3C), commercial outlets (Class 4B and 4C), and food and beverage outlets (Class 4D) at street level. |
Sunny Coast Lido & Garden, Luzzu Lido and Suncrest Lido, Triq il-Luzzu c/w, Triq il-Qawra, Qawra, San Pawl il-Bahar |
No |
PA/06823/21
|
Proposed installation of 3 single point moorings and floating pontoon adjacent to the development approved in PA/04534/20. |
Beefbar on the Beach, Dawret il-Gzejjer, San Pawl il-Bahar |
No |
PA/07366/21
|
Reinforcement to existing quay walls and subsequent maintenance dredging to inner part of the quay for navigational purposes |
Msida Creek, ix-Xatt ta' Xbiex, Xatt l-Imsida, Msida, Triq ix-Xatt, Pieta |
|
PA/05545/22
|
Proposed installation of floating pontoons and boat berthing facilities. |
Manoel Island Yacht Yard, Triq il-Forti Manoel, Manoel Island, Gzira. |
No |