Reference No. Project Title Location EIA Required
PA 07288/19 Mining of ex Luqa Landfill in order to lower the existing levels to prepare site for extension of Industrial estate and new sports facilities. Luqa Park, Triq Valletta, Luqa.
PA/03123/18 Construction of Multi-Material Recovery Facility Site at (adjacent to CA facility), Triq Hal Far, Benghajsa, Birzebbugia, Malta No
PA/02406/18 Proposed upgrade of existing bovine farm D327, covered by PA4584/06, according to policy 2.3A of the Rural Policy and Design Guidance, with the capacity to process effluent from other farms. Site at Triq Zghawri, Munxar, Gozo No
PA/01586/18 To amend permit PA0964/11 and alter the internal lateral landfill profile to increase volume capacity on Għallis non-hazardous landfill, while retaining site are. Magħtab Environmental Complex, Triq is-Salini, il-Magħ​tab, Naxxar, Malta No
PA/03854/18 Extension to approved/existing scrapyard, relocation of recycled compartments, construction of class 4 shop and garage. ​Site at, Trihills Heavy Industries Ltd, Triq Tal-Barrani, Ghaxaq, Malta​
PA/03144/19 Proposed conversion of an un-used existing hazardous cell into non-hazardous cell, including extension of cell boundary and sanctioning of excavation. Maghtab environmental complex No
PA/04964/20 & PA/07018/23 To carry out alterations from approved permit PA1586/18 including sanctioning of variations to Ghallis profile from that approved in permit PA 964/11 and alter the vertical height of the landfill profile to increase the volume capacity of Ghallis Non-Hazardous Landfill while retaining the site area. Ghallis Landfill, Maghtab Environmental Complex, il-Maghtab, Naxxar No
PA/06237/22 Pilot Project to explore, through a twenty‐month research project, ways to recover value from pig and cow slurry, in‐ line with awarded European funds (European Agricultural Fund for Rural Development). Ta’ Farsina, Ħal Qormi No